| |
|
|
| |
Iraqi Airways Headquater Complex
AIA headquarters extension at Abu Nu'as street 1992
Location: Abu Nu'as St. Baghdad- Iraq, On the river side of Tigris.
Client: Iraqi Airways
This project was designed to accommodate all Iraqi airways headquarters employees in addition to Iraqi airways club, training center and clinic in the year 1990.
client : AIA company
date : 1990
cost : 700,000
cost : 1,500,000
|
 |
 |
| Peoples' Council Complex of Nassiria
Location: Nassiria city
Client: Municipal of Nassiria
2003
Municipality of Nassiria like other municipalities in Iraq must have a special building to accommodate the municipality council to meet, discuss and decide on certain issues related to the people and government.
this building can also be used for especial meetings and occasions, that is why it includes also a large meeting hall in addition to administrative offices.
this project was awarded to our firm in 2003. The estimated cost was 250,000,000-I.D.
client : Municipal of Nassiria
date : 2003
cost : 250,000,000
|
 |
 |
| Nassiria Official Rest House
Location: Nassiria city
Client: Municipal of Nassiria
2003
The Ministry of Interior affairs had a scheme of developing the capitals of the municipality of the southern part of Iraq which the city of Nassiria is one of these.
Nassiria city lacks an official rest house to accommodate the officials visitors of the municipality and a place to hold the ceremonial gathering there.
the firm was assigned this project in 2003. The estimated cost was 130,000,000-I.D.
client : Municipal of Nassiria
date : 2003
cost : 130,000,000
|
 |
 |
| Baghdad Bank Jamila Branch
Location: Jamila district designed in 1999
Client: Baghdad Bank
Baghdad Bank needed a branch at Al-Jamila district in 1999, and commissioned the project to the office as designers and constructors.
It was a one floor layout in a building already built at the site. So the job was to rehabilitate it to fulfill the bank requirements with minimum expenses. Total cost was 350.000.000- I.D construction with furnishing. It was a total turn-key project
client : Baghdad Bank
date : 1999
cost : 350,000,000
|
 |
 |
| Habibia Police Complex in South East of Baghdad
Location: Habibia-Baghdad
Client: Ministry of Interior Affairs-2003
Showing fortress-like expressions throughout the building was to define the type of functions it supplies to the community and that was a reason for the client to standardize four other similar to fulfill the requested renovations by higher authorities.
client : Ministry of Interior Affairs
date : 2003
cost :
|
 |
|
| Iraqi Reinsurance Headquarters
Location: Al-Firdows Square - Baghdad
Client: Ministry of Finance Reinsurance Company-2003
Iraqi Reinsurance Company owns a large plot at Al-Firdows Square, commissioned the office to design a master plan to it consisting five commercial buildings and the sixth to be the headquarters of the company. Depending on the structure showed the artistic touch of the designer and his ability of mastering the sculptural signs in architecture. The estimated cost is 750.000.000-I.D.
client : Ministiry of Finance
date : 2003
cost : 750,000,000
|
 |
 |
| Iraqi Airways Building in Mousel
Location: Mousel
Client: Iraqi Airways Company-Ministry of Transportation-1992
A commercial building was commissioned to the office to be designed to the Iraqi Airways Company in Mousel. The ground floor will be the company’s headquarter at that municipality while the upper floors will be commercial apartments to be rented for the benefit. Still the structure remains the main feature of the elevation elements. Simplicity of form defines the mass of the building that occupies a curved land facing a square.
client : Iraqi Airways Company
date : 1990
cost :
|
 |
|
| Iraqi Commercial Bank Headquarters and Main Branch Building
Location: Alsa'adoun Street Baghdad
Client: The Iraqi Commercial Bank-1998
A five-store building located at the middle of Al-Sa’adoon Street surrounded by commercial buildings, entertainment, and hotels was designed to be the headquarters of the Iraqi Commercial Bank. The main bank branch will use the lower two stories and basement, while the upper three will accommodate the bank’s headquarters. The office held the responsibility of construction management to the building after designing it for the client. It took two years to be constructed with the total cost of 650.000.000-I.D.
client : The Iraqi Commercial Bank
date : 1998
cost : 650,000,000
|
 |
 |
United Bank for Investment U.B.
Al-Karada Branch-1993
Location: Al-Karada District in Baghdad Client: United Bank for Investment
The U.B.I. Bank planned to build number of branches all over Iraqi main cities and towns. This building is considered to be the first branch located at the commercial center of Karada. This is one of the buildings which was commissioned to the firm as a turn-key job. Designed and constructed and furnished to the bank completely in eighteen months.
client : United Bank for Investment
date : 1993
cost :
|
 |
 |
| Project |
Client |
Date |
Cost |
| Insurance complex in Basrah |
Insurance company |
1969 |
300,000 |
| General enterprise for trading, building and stores |
General enterprise for trading in Basrah |
1974 |
200,000 |
| General enterprise for trading, building and stores |
General enterprise for trading in Mosul |
1974 |
150,000 |
| Amin Kakis office (interior design) |
|
1992 |
150,000 |
| Municipal of Nassiria building |
Municipal of Nassiria |
2003 |
2,500,000,000 |
| Yarmouk police complex |
Ministry of Interior Affairs |
2003 |
1,250,000,000 |
|
|
assiria Bridge in Dhi-Kar
Location: the Down Town of Nassiria
Client: Municipal of Nassiria
One of the main aspects of Adnan Aswad's design is to emphasize on the structure as a mean of his sculptural touch and hobby. This is shown in most of the detailed structural elements of the building, which became afterwards the focal point of the street.
Client : Municipal of Nassiria
Date : 2002
Cost : 1,280,000,000
|
 |
|
| Project |
Client |
Date |
Cost |
| Sihaila’s bridge in Mosul |
General Enterprise for roads and bridges |
2002 |
1,250,000,000 |
|
|
Al-Sagha Market
|
 |
 |
Al-Mamoon Supermarket
Location: Al-Mamoon Dist., Baghdad-Iraq
1998
Client: Iraqi Cooperative Union
It is one of the few supermarket buildings in Baghdad owned by Iraqi Co-operative Union.
The project was one of two projects awarded to us to work on the complete design of its building in the year1998.
|
 |
 |
-Sadoon Commercial Center
Location: Al-Sadoon St., Baghdad- Iraq
Client: Iraqi Airways 1991
This ten story commercial building project was started in 1991 and it included offices, flats, shops, international airline agencies, a bank and an underground car park.
|
 |
 |
Commercial Building at Al-Rubai'i Street in Baghdad 1993
Client: Mr. Adnan Aswad
One of the main aspects of ADNAN ASWAD's design is to emphasize on the structure as a mean of his sculptural touch and hobby. This is shown in most of the detailed structural elements of the building, which became afterwards the focal point of the street.
|
 |
 |
Mr. Shawqi Al-Kubaisi Two Tower Commercial Complex
Client: Mr. Shawqi Al-Kubaisi
1992
Located at the most expensive area of Sadoon St. - Baghdad, it was build in 1992. One of the ten story towers is used as an office block and the other one as a residential one.
Both are above two store super market and an underground car park.
|
 |
 |
| Visitor city - First Prize Competition Urban Design Phase two 2000
Client: Municipality of Najaf
Phase two of the project was commissioned to be designed as four star hotels in one complex to occupy the foreign visitors of the holy city facing the shrine from one side and the Najaf sea from the other side. Depending on the slope of the site the benefit of the view was reached to all hotels.
|
 |
 |
Reinsurance Building
Location: Al-Firdows Square
Client: Ministry of Finance Reinsurance Company 2003
Al-Saddoon Commercial Center
Al-Saddoon St. Baghdad - Iraq
Client: Iraqi Airways-1992
A ten storey commercial building includes offices, flats, shops, international airline agencies, a bank and an underground car park located at Al-Saadoon main street . The owner, Iraqi Airways Company commissioned this project to the office in 1992 and the estimated cost was 2.500.000- I.D
|
 |
 |
Commercial Building in A'Adhamia 1999
Client: Mr. Anwar Sabri
Two main features signify this design. The first is depending on the idea of sculptural structural framing to exhibit the mass of the building and secondly the use of color that Baghdad lacks. It is located at the officer's main road in A'adhamia district consisting of three commercial floors and a basement. The estimated cost was 650.000.000- I.D.
|
 |
 |
Al-Rabi'i Building-1990
Location: Al-Rabi'i street in Jamia'a District
Client: Mr. Ridha Al Kafagi
The main feature in this building is the concrete structure with its slender columns embraced with simplified details to attract light from the skylight above and to insure having sharp shades and shadows at the interior court that is the main entrance of the building.
|
 |
 |
| Reinsurance Commercial Building
Location: in Kerbela City
Client: Ministry of Finance-Iraqi Reinsurance Company-2003
The Reinsurance Company investments in Kerbela were commissioning this project to be designed as a three star hotel. Its conceptual design was to depend on the structural frame to form the mass and the final view of the elevation to minimize cost.
|
 |
 |
| Project |
Client |
Date |
Cost |
| Shopping center in Imara union |
General cooperative |
1987 |
40,000 |
| Uruba shopping center in Imara |
Municipal of Imara |
1975 |
150,000 |
| Mansour commercial building |
Mr. Said Almahdi |
1983 |
70,000 |
| AIA commercial center in Mosul |
AIA company |
1993 |
7,000,000 |
| Commercial building at Karrada |
Mr. Ra’ad Kailani |
1992 |
4,000,000 |
| Commercial building at Baghdad |
Mr. Zeki Al-Kudairi |
1983 |
 |
| Alandalous commercial building |
Mr. Ahmed Sadiq |
1992 |
350,000 |
| Masbah building |
Mr. Hamza Habib |
1988 |
500,000 |
| Al-Rabi building |
Mr. Ridha Al-Kafagi |
1990 |
800,000 |
| Za’afarania building |
Mr. Fatah Al-Duri |
1992 |
600,000 |
| Raqhiba katon building |
Mr. Dhia’a Al-Dabagh |
1993 |
1,500,000 |
| Al-Keramat building |
Mr. Muhi’i Alhemus |
1993 |
2,000,000 |
| UBI building United Investment Bank |
|
1993 |
95,000,000 |
| Commercial bank (Mansour Commercial Iraqi Bank Branch) |
|
1994 |
8,500,000 |
| Al-Rubai’i commercial center |
Mr. Adnan Aswad |
1994 |
25,000,000 |
| Kerbela city religious center development |
Municipal of Kerbela |
1995 |
400,000,000 |
| Hotel at Kerbela Iraqi reinsurance company |
|
2003 |
250,000,000 |
|
|
educational Buildings
|
| Project |
Client |
Date |
Cost |
| Natural history museum building |
University of Baghdad |
1966 |
250,000 |
| Agricultural polytechnic building |
University of Baghdad |
1966 |
50,000 |
| Central laboratory at Abu Ghureib |
Ministry of municipals |
1976 |
300,000 |
|
|
industrial buildings
| Project |
Client |
Date |
Cost |
| Natural history museum building |
University of Baghdad |
1966 |
250,000 |
| Agricultural polytechnic building |
University of Baghdad |
1966 |
50,000 |
| Central laboratory at Abu Ghureib |
Ministry of municipals |
1976 |
300,000 |
|
|
monuments and competition
Bilat Al-Shuhada Memorial Monument
Location: the South-West of Baghdad on the motorway connecting South of Baghdad to the West.
Client: Municipality of Baghdad – 1988
On the 13th of October 1987 one of the Iranian rockets hit Bilat Al-Shuhada elementary school in Dora -Baghdad caused large and serious destruction to the school building and causing childhood massacre, killing 43 students all under 12. The municipality of Baghdad awarded the design of this memorial monument to our firm on the basis that our task is to design the building and all interior and sculptures, in additional to structural designs required to construct external sculptures done by Iraqi artists. The building includes a museum, cinema, cafe, shops, and other childhood services and recreational areas.
client : municipal of Baghdad
date :1988
cost 2,250,000
|
 |
 |
Saddam Mosque in Al-Ouja
Competition at 1982 3rd Award
Design has been dependent on the Islamic religion philosophy. At the same time the vernacular architecture of Iraq was taken into consideration. Form of design is not the usual, nor the typical of Islamic mosques, yet it is the sculptural out look of the architect.
client :Presidential affairs dept.
date : 1983
cost
|
 |
 |
| Presidential Palace
Architectural Design competition – 1988
Client: Presidential Administrative Office
Located at the South West of Baghdad on the right side of the highway to Baghdad International Airport.
When it was announced that this design has got the second prize among the fifty one participants at the competition, most of the architects agreed that it was the best, because of the symbolic approach to the design, good expression and understanding of Iraqi tradition and heritage.
Devecon, the consultant firm from Finland gave good support and assistance to prepare excellent presentation to the design.
client : Presidential affairs dept.
date : 1988
cost :
|
 |
 |
The Four Island Presidential Rest House
Location: one of the artificial lakes of Baghdad – 1990
Client: Presidential Administrative Office
Four golden pyramids on four square islands with an inverse pyramid in between, connected together by lifts and staircases in cylindrical forms is to be used as a presidential guests' and rest house.
client :Presidential affairs dept
date: 1989
cost :
|
 |
 |
Presidential Rest House
Location: On one of the hills near Baghdad International Airport 1989.
Client: Presidential Administrative Office
It was a closed invitation to work out a design for a personal rest- house to be built on top of one of the hills 30 meters above the road level south of Baghdad.
All facilities and functions available in the presidential palaces are to be present in this design.
The design is distinctive in it's mixed functions, forms and spaces, because of the hilly shaped area assigned to this building and also due to the surrounding landscape and approach to the hill top.
client : Presidential affairs dept.
date: 1900
cost :
|
 |
 |
Visitors City - First Prize - Competition Design
Old City of Najaf - Iraq 1997
Client: Municipality of Najaf
Visitors to IMAM ALI holy shrine at the center of the old city of Najaf needs a great deal of services which the city of Najaf lacks from, such as hotels, shops, restaurants, cafes, arcades, car parks, and public toilets. This project is to be built at the area between the IMAM ALI holy shrine and Najaf sea cliff on an area of 55000 sqm.
|
 |
 |
Presidential Rest House
Location: On one of the hills near Baghdad International Airport-1989
Client: Presidential Administrative Office
It was a closed invitation to work out a design for a personal rest house to be built on top of one of the hills 30 meters above the road level south of Baghdad. All facilities and functions available in the presidential palaces are to be present in this design. The design is distinctive in its mixed functions, forms and spaces, because of the hilly shaped area assigned to this building and also due to the surrounding landscape and approach to the hill top.
client : Presidential Administrative Office
date : 1989
cost :
|
 |
 |
| Project |
Client |
Date |
Cost |
| Haj Umran building at Al-Kulafa street in Baghdad (firs prize) |
Ministry of Endowment and religious affairs |
1975 |
300,000 |
| Victory arch monument (firs prize) |
Presidential affairs dept. |
1983 |
|
| Islamic bank residential complex |
Iraqi Islamic Bank |
1995 |
|
|
|
private residential houses
Saeid Al-Mahdi Residence
Location: the South West of Baghdad on the motorway linking between South and West of Baghdad.
Client: Municipality of Baghdad-1988
date :1984
cost : 1,000,000
|
 |
Jadira Private Studio
Client: Mr. Adnan Aswad -1986
client : Mr. Adnan Aswad
date : 1986
cost : 250,000
|
 |
| Project's |
Client |
Date |
Cost |
| House at Al-Mansour |
Mr. Tariq Al-Dahwi |
1988 |
400,000 |
| House at Al-Yarmouk |
Mr. Hamza Habib |
1988 |
500,000 |
| House at Kadimia |
Mrs. Raja'a Derweesh |
1992 |
1,250,000 |
| House at Al-Mansour |
Mr. Ahmed Ismaiel |
1992 |
2,000,000 |
| House at Jadria |
Distilary comp.& products |
1992 |
4,500,000 |
| House at Al-Arasat |
Mr. Hashim Al-Sa'adi |
1993 |
3,000,000 |
| House at Waziria |
Mr. Najat Abdulla |
1996 |
60,000,000 |
|
|
recreational Buildings
 |
 |
| Project’s name |
Client |
Date |
Cost |
| Karkh park |
Municipal of Baghdad |
1967 |
250,000 |
| Iraqi hunting club complex |
Iraqi hunting club |
1971 |
1,500,000 |
| Fawanees restaurant at Baghdad |
Mr.Zeki Kudairi |
1975 |
200,000 |
| Goldsmith apartment building in Imara (first stage) |
Municipal of Imara |
1975 |
150,000 |
| Alwia club building complex |
Alwia club |
1979 |
2,250,000 |
| Tourist residential complex at Samara |
Mr.Husain Al-Hadidi |
1993 |
3,000,000 |
|
|
|
|
|
|
relegious buildings
Saddam Mosque in Al-Ouja
Competition at 1982 3rd Award
Design has been dependent on the Islamic religion philosophy. At the same time the vernacular architecture of Iraq was taken into consideration.
Form of design is not the usual, nor the typical of Islamic mosques, yet it is the sculptural out look of the architect.
|
 |
 |
Marzaia Church
Location: Daora-Baghdad Client: Orthodox Church-1984
The Daora residential district had no church to fulfill the spiritual needs of its inhabitants, so the orthodox community there commissioned the office to design and construct a medium size church at a plot they were donated. As the orthodox community usually comes from the north of Iraq, the style of the building outlook was part of the main idea by showing the vernacular architecture of the area they came from.
|
 |
 |
| Project’s name |
Client |
Date |
Cost |
| Marzaia Church |
Orthodox Church |
1984 |
600,000 |
| President's mosque at Al-Aoja |
Ministry of Endowment and religious affairs |
1983 |
|
|
|
residential buildings
 |
| Project |
Client |
Date |
Cost |
| Haj Umran Hotel |
Ministry of Building Northern Region |
1970 |
260,000 |
| Technology institute hostel |
Institute of technology |
1973 |
200,000 |
| 14th of July St. residential building in Basrah |
Ministry of Endowment and Religious Affairs |
1975 |
1,800,000 |
| 77 Abu Al-Hassan residential building at Basrah |
Ministry of Endowment and Religious Affairs |
1975 |
2,000,000 |
| Um Al- Quara rest house development at Tikreet |
General Directorate of Ttourism |
1976 |
600,000 |
| High rise apartment building complex in Basrah |
Ministry of Endowment and Religious Affairs |
1978 |
700,000 |
| Apartment Complex at Alwia |
Mr. Saied Aisoufi |
1986 |
250,000 |
| Residential apt. building in Jadria |
Damlouji & Partners |
1993 |
80,000,000 |
|
|
urban design
Between the Two Holly Shrines Development - Kerbela
Client: Between the Two Holy Shrines Development Committee
This project was located at the heart of the old city of Kerbela.
The implementation of the presidential resolutions in 1997, to develop the heart of Kerbela where the two Imams, Al-Hussain and Al-Abbas Holy Shrines are.
|
 |
 |
Visitors City First Prize competition DesignOld City of Jajaf-Iraq-1997
Client: Municipality of Najaf
Visitors to Imam Ali holy shrine at the center of the old city of Najaf need a lot of services which the city of Najaf lacks to such as hotels, shops, restaurants, cafes, arcades, car parks, and public toilets. This project is to be built at the area between the Imam Ali holy shrine and Najaf sea cliff on an area of 55000m2.
|
 |
 |
| Visitors City of Najaf First Prize Urban Design Competition-1996
Client: Ministry of Interior Affairs
Some of the photographs taken to the detailed model done by the office upon the request of the presidential affairs department, submitted on 1999 to the client showing phase one and two.
|
 |
 |
Imam Ali Reception Hall and Main Public Toilets
Location: Old city of Najaf- Iraq-1999 Client: Municipality of Najaf
A 500 person reception hall was required to be designed to facilitate the needs of the municipality gatherings to all official and ceremonial occasions held in the holy city of Najaf. This is placed underground the main plaza facing the parking area
|
 |
 |
Visitors City in Najaf First Prize Urban Design Competition-1996
Client: Municipality of Najaf
Visitors to Imam Ali holy shrine at the center of the old city of Najaf needed lots of services which the city lacks. Hotels, shops, restaurants, cafes, arcades, shelters, car parks and public toilets are the main requirements. The project is to be built at the area between the Imam Ali holy shrine and Najaf sea cliff on an area of 55000m2.
|
 |
 |
Visitors City-First Prize Competition Urban Design Phase Two-2000
Client: Municipality of Najaf
Phase two of the project was commissioned to be designed as four star hotels in one complex to occupy the foreign visitors of the holy city facing the shrine from one side and the Najaf sea from the other. Depending on the slope of the site the benefit of the view was reached to all hotels.
|
 |
 |
| Visitors City of Najaf Main Shaded Plaza-2000
Client: Municipality of Najaf
Plans showing the last proposal to the shades at the plaza facing the Imam shrine The municipality decided that these shades were to be constructed on the expenses of the surrounding owners therefore it was simplified because of the high cost of the first proposal yet it kept the same idea.
|
 |
 |
Visitors City of Najaf Main Underground Car Park-1998
Client: Municipality of Najaf
Part of phase one is the underground car park. It was designed to accommodate 600 cars and 50 buses on an area that goes up to 1900m2 Still the structure is the main outlook of this part of the project. Above the roof of the car park is the main central gathering shaded park.
|
 |
 |
| Project's |
Client name |
|
| Visitors city of Najaf Between the two Holy Shrines development |
Municipality of Najaf |
| Urban Planning |
|
|
|
|
|
|
|
|
|
|
|